

That’s how my GPU instances for reencoding connect to my self deployed seed box instances. Works just fine.
That’s how my GPU instances for reencoding connect to my self deployed seed box instances. Works just fine.
So, basically ham radio but with more Kubernetes.
About 1500€/kWp. If I calculate that everything explodes right after the extended warranty has run out, it’ll be about 0.13€ per kWh generated. I don’t think this will happen if course, but at 0.37€ per kWh from the grid it was a no-brainer with that as an upper limit for the energy price.
Eh, in summer my solar panels are shitting out so much energy that most things beneath 8kW power are basically free during the day. And I can only drive the car so much and use the A/C before I’m forced to almost donate it to the electricity company for 0.07€/kWh. Might as well turn it into cycles.
Eaton. Supported by Nut, works with 50Hz as well as the 52Hz my emergency power puts out.